Find Carbon Steel Pipe, Carbon Steel Tube, Carbon Seamless Steel Pipe on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.
Home > Products > Carbon Steel Pipe/Tube > Others Carbon Steel Pipe/Tube > carbon steel pipe hot water pipe insulation
The Latest Product Alerts Send Me
carbon steel pipe hot water pipe insulation
  • carbon steel pipe hot water pipe insulation
  • carbon steel pipe hot water pipe insulation
  • carbon steel pipe hot water pipe insulation
  • carbon steel pipe hot water pipe insulation
  • carbon steel pipe hot water pipe insulation
Payment Type: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Min. Order: 10 Ton/Tons
Delivery Time: 5 Days
Basic Info
Product Description carbon steel pipe hot water pipe insulation 1. carbon, Alloy Steel tubing
2. tubing professional manufacture
3. steel tubing with iso, ce, api
4. moq: 1ton Description
Standard astm a53, a106, api 5l, a333, a210, a192, a179, gb8162, gb8163, din17175, din1629, bs1387, iso3183
Grade a53, a106, api 5l gr.b, all x grade, a333 gr.6, a179, a192, st35, st37, st45, 10#, 20#
Thickness  4-59.54mm
Out diameter                    21.3-914.4mm
Section shape round
Place of original China, tianjin
Production technique Hot rolled, cold drawn
Brand  steel tube-wanlei
Usage tube for conveyance of fluid, boiler tube,precition tube, tube for structrual work etc
Tube end  plain or bevel end 
Surface treatment Varnish, black painting
Country of export steel tube exported to korea, taiwan, hongkong, singapore, indonisia, canada, india, finland etc.
Production certificate steel tubing passed iso, ce, api certificate
Production capacity 3000-4000ton tubes per month 
Trade terms FOB, CFR, CIF 
MOQ 1Ton trial order for steel tubing is accepted
Lead time 5-7 days for stock tube, 10-15 days for special size 
  Warehouse and steel tubing in stock       Loading of steel tubing   Certificate of steel tubing    Other information for you placing order easily   >>>To offer you a detailed quotation to save your time, we highly appriciate that you could tell us below info:   Standard of steel pipe Grade / material of steel pipe Size of steel pipe, include the od, thickness, length Required quantity in meter or ton   >>>MOQ, Lead time & payment terms MOQ: 1 Ton Lead time: 5-7 days for stock pipes, 7-20 days for customized pipes Production capacity: 3000-4000 ton / month Payment terms: T/T (30% tt deposit, 70% before shipment); L/C (30% tt deposit, 70% L/C at sight) or other payment terms negotiable Trade terms: FOB, CFR, CIF Trade currency accepted: USD, EUR   More details, call us for furture communication. You will get prompt response with professional technique knowledge and kind service.   Mrs Ely Wang Tianjin WanLei Steel Pipe Co.,Ltd Tel:+86-22-25343802 Skype: wanleipipe   

Contact us if you need more details on Hot Water Pipe Insulation. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Hot Water Pipe、Insulated Water Pipe. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Carbon Steel Pipe/Tube > Others Carbon Steel Pipe/Tube